Doug Wasankari and crew brought in the gravel and leveled it in preparation for pouring concrete to create the new loading dock. Doug and the guys do a great job. Meanwhile, painter Dan Tate is on the second story touching up the paint. All the windows are trimmed out in green on the west side now. On the east side, notice that the surrounding area is also being leveled. That's Doug on the machine.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment