19 November 2007

Snow!


Snow has finally arrived on the Palouse and all the moisture is giving the new drainage system the acid test. So far, so good. Crews created a system that drains water away from the building, routing it further down the tracks. With all the rain and snow, quite a little lake is developing. In the past, much of that moisture would've gone under the depot. Despite all the standing water found under the building when it was lifted, it seemed the old buildling had still fared well and the supports were in good shape. It is amazing how stout that old depot is. Built to last!

No comments: